Upgrade of Al Khawaneej Road and Mushrif Park Corridor

Upgrade of Al Khawaneej Road and Mushrif Park Corridor

The Upgrade of Al Khawaneej Road and Mushrif Park Corridor in Dubai is a key infrastructure project designed to enhance connectivity while preserving one of the city’s major public parks. The client was facing challenges in achieving grade separation within a constrained corridor while minimizing impact on the surrounding park environment and maintaining an aesthetically pleasing solution.

POME delivered an optimized MSE wall system that enabled construction within tight space constraints, using natural-toned finishes that blend with the landscape, resulting in a durable, cost-efficient, and environmentally integrated solution.

Project Details:

Contractor

M/s Tristar Engineering & Construction LLC

Client

M/s Roads & Transport Authority (RTA)

Consultant

M/s KEO International Consultants

Benefits

Reduced construction cost and time compared to conventional alternatives

Visually attractive finish that blends with the natural park environment

Reduced carbon footprint through use of site-won fill material

Minimized land take within constrained project limits

Reduced material haulage and associated environmental impact

Durable retaining solution with long-term performance