The E11 to Madinat Zayed Link Road upgrade in Al Dhafra addressed challenging sabkha conditions along a critical corridor. Spanning a 7 km section over weak, saline soils, the project required a solution that minimizes disruption, cost, and construction time.
POME delivered an optimized ground stabilization solution that eliminated full excavation, reduced construction time and cost, and minimized traffic disruption, while utilizing recycled and locally available materials to achieve a durable, low-carbon pavement solution.




























