The Improvement of Al Qudra – Jabal Ali Lehbab Road Interchange Bridge in Dubai is a critical infrastructure upgrade enhancing access and traffic flow within the surrounding network. The project required the expansion and realignment of existing retaining structures while maintaining continuity with previously constructed systems from earlier phases. The client was facing challenges in seamlessly integrating new and existing structures, accommodating underground utilities, and maintaining consistent aesthetics across multiple upgrades.
POME delivered an optimized MSE wall solution that enabled seamless connection to existing walls, flexible design adaptation for new ramps, and efficient construction, resulting in a durable and unified infrastructure solution across all phases of development.




























