Click on the Edit Content button to edit/add the content.

Al Qudra-Jabal Ali Lehab Rd Bridge

Al Qudra-Jabal Ali Lehab Rd Bridge

The Improvement of Al Qudra – Jabal Ali Lehbab Road Interchange Bridge in Dubai is a critical infrastructure upgrade enhancing access and traffic flow within the surrounding network. The project required the expansion and realignment of existing retaining structures while maintaining continuity with previously constructed systems from earlier phases. The client was facing challenges in seamlessly integrating new and existing structures, accommodating underground utilities, and maintaining consistent aesthetics across multiple upgrades.

POME delivered an optimized MSE wall solution that enabled seamless connection to existing walls, flexible design adaptation for new ramps, and efficient construction, resulting in a durable and unified infrastructure solution across all phases of development.

Project Details:

Contractor

M/s DBB Contracting LLC.

Client

M/s Roads & Transport Authority (RTA)

Consultant

M/s Parsons

Benefits

30–40% reduction in construction time compared to RC wall alternatives

30–40% savings in material cost compared to reinforced concrete walls

Seamless integration with existing structures across multiple project phases

Flexible design accommodating realignment and underground utilities

Consistent architectural finish ensuring continuity of aesthetics

Durable and reliable long-term retaining wall solution