Fujairah Link Road

Fujairah Link Road

The Fujairah Link Road project is a key infrastructure development connecting Sheikh Khalifa Street to the Khatam Al Mualaha Border Post and Road E99, enhancing regional connectivity and traffic flow. The project required a cost-effective and durable pavement solution capable of supporting high traffic loads while accelerating construction.

POME delivered an optimized pavement design that reduced material usage and pavement thickness, enabling faster construction, lower cost, and improved long-term performance, resulting in a resilient and efficient roadway tailored for sustained serviceability

Project Details:

Contractor

M/s Fala Road Contracting and Top Link Contracting and General Transport M/s

Client

M/s Ministry of Energy and Infrastructure (MOEI)

Consultant

M/s Idroesse infrastructure

Benefits

280,000 m² of roads delivered using optimized pavement design

Faster and more economical construction

Reduced construction and lifecycle costs

Reduced material usage without compromising performance

Increased pavement life and durability

Lower maintenance requirements over time